Why small runs are harder than big ones
A 100-piece style costs the same to pattern, sample and set up as a 1,000-piece style, and the margin comes from the second run. Most factories therefore take small orders last in the queue and move the date when a bigger buyer calls. We plan small runs into the line from the start, which is why we quote fewer styles at a time.
The five stages
| Stage | What happens | Time |
|---|---|---|
| Brief and costing | Tech pack, reference or mood board reviewed; fabric and target FOB agreed | 48 hours |
| Fabric and pattern | Lab dips, hand-feel approval, pattern made and graded to your chart | 3–5 days |
| Sampling | Fit sample, revisions until fit, fabric and construction are signed off | days |
| Bulk | Cutting, sewing, finishing, in-line checks, AQL 2.5 final inspection | days |
| Packing and export | Labels, hangtags, polybags, cartons, barcodes; FOB, CIF or DDP | 2–4 days |
Replenishment
Once a style is approved, we keep the pattern, the fabric record and the approved sample for two years. A repeat order runs without re-approving anything, and a mid-season top-up can be quoted against the same fabric lot where it is still available.
Terms
- 30% deposit on order, 70% before shipment
- Sample cost credited against bulk orders above 300 pieces per style
- FOB Shenzhen or Guangzhou; CIF and DDP quoted on request
- NDA signed before patterns are reviewed
What we will not do
We do not resell another factory’s stock as our production, and we do not run your approved design for a second buyer. If a style needs equipment or finishing we do not have, it is cheaper for both of us to hear it at quoting stage.